-
Construction Clearance Application (fillable) — Owner; Lot/Blk; scope; drawings; timeline; contractor; Traffic/Delivery Plan; Waste/Restoration Plan; deposit amount; signatures.
-
Worker List & ID Sheet — Name; ID no.; contact; role; photo.
-
Daily Safety Checklist — PPE; barricades; tools; housekeeping; lane kept open; extinguisher present.
-
Delivery Schedule Sheet — Truck type; plate; dates/times; materials; staging location; spotter assigned.
-
Pre/Post Inspection Checklist — Roads; drains; curbs; sidewalks; landscaping; photos attached.
-
Stop‑Work Order Template — Rule violated; hazards; cure steps; re‑inspection date.
Search Knowledge Base Articles
Article 7 — Forms, Templates & Checklists (Downloadables)
Did you find this article useful?
Related Articles
-
Article 1 — Construction & Renovation Clearance (Step‑By‑Step)
When clearance is required Any exterior works, structural changes, additions/roofing, driveway/uti... -
Article 2 — Contractor Entry, Site Safety & Working Hours
Gate & IDs Submit Worker List with valid IDs; guards issue contractor passes. Passes must be s... -
Article 3 — Deliveries, Staging & Traffic Control
Delivery windows Regular deliveries: 8:00 AM – 6:00 PM. Restricted hours (deliveries): aft... -
Article 4 — Refundable Damage Deposit & Restoration Standards
Deposit Amount: [₱ amount] (based on project scope), refundable after clearance. Pay to HO... -
Article 5 — Waste, Debris & Environmental Rules
Waste & hauling Owner/contractor must haul debris off‑site to an LGU‑accredited fa...